2015-12-19 Plymouth, MA

Plymouth Emergency Bypass

Complete bypass of 30” sewer force main with approximately 10-miles of 18” fused HDPE pipe, ...

Read more >>
2012-12-01 Middletown, RI

Esplanade Drainage Improvements

The Esplanade project involved construction of a riprap causeway, drilling & blasting of the ...

Read more >>
2011-08-01 Providence, RI

Combined Sewer Overflow Separation

C.B. Utility installed approximately 10,000 linear feet of PVC & reinforced concrete pipe and ...

Read more >>
2011-03-01 Warwick, RI

Warwick Emergency Project - Cedar Swamp Road

Repair of a 48” RCP collapse and pumping station failure, shoring the site by driving steel ...

Read more >>
2009-04-01 Newport, RI

Long Wharf Force Main Repair Project

Complete bypass of 36” sewer force main with 37,000’ of 18” fused HDPE pipe, including tie-ins ...

Read more >>
2007-09-01 Barrington, RI

Replacement of Sewer Force Main

Bypass of 7920’ of 24” PCCP sewer force main with 18” fused HDPE pipe and installation of a 24” ...

Read more >>
2007-08-21 Waterford, CT

Smith Cove Emergency Sewer Force Main Repair

Repair of a leaking 14” cast iron sewer force main located 45’ offshore under the Smith Cove ...

Read more >>